Kitchen remodeling: greige shaker kitchen with dark soapstone-look counters and a window to pine woods

Custom Kitchen Remodeling | Kenneth Cox Construction

Kenneth Cox Construction has done kitchen remodeling in MidCoast Maine since 1988, and the question everybody asks first is how long they will be without a kitchen.

  • 38 years in business, since 1988
  • Over 250 projects completed
  • Affordable work, two-year written warranty

A kitchen remodel in MidCoast Maine runs on the order of the trades, not on wishful thinking. Demolition, framing, plumbing, electrical, drywall, flooring, cabinets, counters and tile all have to fall in line, and some of them wait on an inspection before they can start.

The delay that catches most homeowners off guard is stone countertops. They get templated only after the cabinets are hung, then fabricated off site, which often means a week or more of living with cabinet-height plywood and no sink, because the plumber's last visit waits on the fabricator.

Make every selection before the first wall comes down and the schedule tightens up considerably. Late cabinet orders are the usual reason a kitchen slides into a second month. Ken has been building kitchens here since 1988, in 1790 farmhouses and postwar ranches alike, and each one carries a written two-year workmanship warranty.

Who are you hiring for kitchen remodeling work?

You are hiring a company that has built kitchens in this region since 1988, in houses ranging from 1790 farmhouses to postwar ranches. Kenneth Cox Construction has been building kitchens in this region since 1988, in houses ranging from 1790 farmhouses to postwar ranches.

The company holds BBB accreditation, and a written two-year workmanship warranty comes with the finished room.

Kitchen remodeling contractor Midcoast Maine: white kitchen with a plaster range hood, open wood shelves and a window to the ocean

How much does a kitchen remodel cost in MidCoast Maine?

A kitchen remodel in MidCoast Maine costs what the layout and the cabinetry decide, and the numbers below are the middle of what we have quoted.

The numbers below are the middle of what we have quoted over many years of kitchens, not a fixed price for yours. Two kitchens the same size can sit in different bands depending on cabinetry and on whether any walls or plumbing move.

ScopeWhat the range coversTypical range
Refresh, same layoutCabinets, counters, sink, flooring, paint, lighting$20,000 to $35,000
Full mid-range rebuildThe above plus wiring, some plumbing, new appliances$40,000 to $70,000
Layout changeWalls moved, plumbing and gas relocated, island added$75,000 to $130,000

Cabinetry is usually the largest single line, and it is also the longest lead time, which is why we order it before demolition rather than after. Stone counters cannot be templated until the cabinets are hung, so that gap is in every one of these schedules whether or not it is in the budget.

What Kitchen Remodeling Services Do We Offer?

  • custom and semi-custom cabinets
  • quartz, granite, laminate, and butcher block countertops
  • backsplash installation
  • kitchen flooring
  • kitchen islands and storage upgrades
  • layout changes and plumbing or electrical relocation
  • lighting and electrical upgrades

What are the steps in a kitchen remodeling project?

  1. Get your free quote

    Ken measures, checks what is behind the existing cabinets, and prices the layout you want against the layout you have.

  2. We bring your project to life

    Trades run in sequence with inspections booked ahead, and you get told the template date as soon as cabinets are set.

  3. Enjoy your new space

    A kitchen finished on the timeline you were given, not the one you were hoping for.

Kitchen renovation contractor Midcoast Maine: white farmhouse kitchen with a gray-topped island, glass pendants and a black-framed window

How Long Does a Kitchen Remodel Take?

The gap that surprises people is the countertop. Stone is templated after the cabinets are installed and then fabricated off site, which is commonly a wait of a week or more with your kitchen sitting cabinet-height and unusable.

Nothing shortens that except knowing about it. The sink cannot be connected until the counter is in, so the plumber's final visit waits on the fabricator.

The way to compress a kitchen is to have every selection made before demolition starts. Cabinets ordered late are the single most common reason a kitchen runs into a second month.

The honest answer depends on the order the trades run in. A kitchen involves demolition, framing, plumbing, electrical, drywall, flooring, cabinets, countertops and tile, and several of those cannot start until another has been inspected.

Ken sequences it tightly and tells you the real number, and every kitchen we build carries a 2-year workmanship warranty from a BBB accredited company.

Kitchen remodeler Midcoast Maine: close-up of an oak cabinet drawer with a brass pull below a stone-look counter edge

The useful work happens before anybody looks at a door style. Where the sink, range and refrigerator sit relative to each other, how wide the walkways are, and whether the room can take an island are the decisions that make a kitchen work.

Clearances are not negotiable. An island that leaves too little room behind a chair looks generous on a drawing and is a nuisance every day.

Our recommendation is to skip the island when it compromises the main aisle or blocks an appliance door. A peninsula, pantry wall, or uninterrupted cabinet run will serve a tight kitchen better than an island installed simply because it appears on a wish list.

How do counters and cabinets get installed and chosen?

Granite is templated off your finished cabinets, never measured off a drawing.

Cabinets go in and get leveled first, then a template is taken on the actual boxes, then the slab is cut to that template. The gap between cabinets and counters usually runs one to two weeks, and planning for that gap is the difference between a kitchen you can cook in and one you cannot.

The slab arrives in pieces sized to clear your door and your stairs. Seams are placed where a seam reads least, normally at a sink or an inside corner, and Ken shows you where each seam lands before anything is cut.

Support matters at an overhang. Anything past roughly ten inches needs a steel bracket underneath, because granite is strong along its length and brittle at an unsupported edge.

What else do people ask about kitchen remodeling?

How long will I be without a kitchen?

You will be without a kitchen for four to eight weeks commonly, depending on scope, with the countertop wait built into that. We give you a written estimate of it before you commit.

Can I keep using part of the kitchen?

You can usually keep using part of the kitchen, because we set up a temporary sink and keep the refrigerator running elsewhere in the house. It makes a real difference over several weeks.

Do I need a permit for a kitchen?

You need a permit for a kitchen where the plumbing and electrical work is concerned. We file it and handle the inspections rather than leaving that to you.

Should I upgrade the electrical service?

You should upgrade the electrical service if the panel is small or already full, and it is worth pricing. Current code requires dedicated circuits in a kitchen, and an old panel is often the constraint.

Kitchen remodeling contractor Midcoast Maine: sage green shaker kitchen with tall windows, a wood stool and wide oak flooring

How do you start a kitchen remodeling project?

You start a kitchen remodeling project with a walk-through and a real schedule. Knowing how many weeks you will be cooking in the dining room is worth more than any showroom visit.

Ken will give you that number honestly, at no charge. Reach him at 207-386-9235.